Study on Assembly Flow Line and Measures to Rectify Interruptions by Utilizing Concepts of Lean Line Manufacturing

dc.contributor.authorJoyjit, Sarkar
dc.contributor.authorRishav, Singh
dc.contributor.authorAnchit, Boral
dc.contributor.authorNandish, G B
dc.date.accessioned2018-06-25T11:11:27Z
dc.date.available2018-06-25T11:11:27Z
dc.date.issued2018-06-25T11:11:27Z
dc.description.abstractThe basic principle of lean line manufacturing has its origins from Toyota, Japan. Lean manufacturing involves the concept of reducing the amount of rejections and rework to increase the production efficiency. It also incorporates the concepts of just-in-time manufacturing, standardization, improvement in strategies, continual assessment and improvement of facilities. In a hybrid assembly line, the one which incorporates both automation and manual interventions, the manual worker can stop the assembly line whenever there is an interruption or failure, in order to fix it. Under such situations it becomes a necessity to optimise the process to reduce both the production time and the rate of rejections. Interruption in the workplace are not new in today’s world, however there are more possible ways to stop them. So, we conducted a set of experiments, measuring interruptions in the assembly auto line of BOSCH spark plug at Naganathpura plant Bangalore and we came out with some possible ways to minimize few of them.The studyin this project work includes methods to analyse and re-design the existing system, providing a set of lean line manufacturing concept and methods to locate and rectify the issues that causes interruptions. Requirement for any changes can be determined utilising the lean manufacturing concepts to study the assembly flow line. The source of issue are also analysed and possible modifications in design are suggested.en_US
dc.identifier.urihttp://hdl.handle.net/123456789/9558
dc.language.isoenen_US
dc.subjectJoyjit Sarkaren_US
dc.subjectRishav Singhen_US
dc.subjectAnchit Boralen_US
dc.subjectNandish G Ben_US
dc.subject1NH14ME713en_US
dc.subject1NH14ME724en_US
dc.subject1NH14ME740en_US
dc.subject1NH15ME430en_US
dc.titleStudy on Assembly Flow Line and Measures to Rectify Interruptions by Utilizing Concepts of Lean Line Manufacturingen_US
dc.typeOtheren_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1NH14ME713.pdf
Size:
3.01 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.79 KB
Format:
Item-specific license agreed upon to submission
Description:
Collections